Self-paced course
Certification program
Price
$14.99
Rating
Complete Updated Course Last Update 11/2022
Complete Package.
Complete Project Estimation Through AutoCAD And Excel.
Complete Project Estimation (Manual Calculations PDF Drawings Same Project.)
Complete Project Estimation (Through Plan Swift Software Same Project)
Primavera P6 Training For Beginners.
We, Will, Create Complete Project In Primavera P6 (The same Project For Which We did the Estimation)
MS Project 2019 Training For Beginners
We, Will, Create Complete Project In MS PROJECT (The same Project For Which We did the Estimation)
Excel Training For Beginners.
Autocad Training For Beginners.
Interim Payment Certificate (Payment process in construction)
Variation Orders In Construction Projects
Practice Questions After the Ending Of Each Module
In Practice Questions,
I have designed a mini Project for you if you did all of the practice questions Step By Step then after ending of this Course You will be able to Do complete project Estimation. And Also Able to do the Planning Of the Same Project In Primavera P6 And Microsoft Project.
Welcome to Quantity Surveying /Building Estimation online training course. it is focused on practical application of Estimation using Auto Cad& M.S Excel
This course is a field-oriented course and contains real examples and a full fledge real project for better understanding
After successful completion of this course, you will be able to Estimate Any Building Project (From Foundation To Finishing)
Major Topics That We Will Learn In This Course:
Quantity Of Substructure (Isolated Footing) Through AutoCAD
Excavation Quantity
Formwork Calculations
Concrete Quantity
Quantity Of Sloped Footing Through AutoCAD
Excavation Quantity
Formwork Calculations
Concrete Quantity
Quantity Of Different Items In Superstructure Through AutoCAD
Column In S.S (Formwork, Concrete)
Grade Beams (Formwork,Concrete )
Slab On Grade (Formwork, Concrete)
Lintel And Top Beam (Formwork, Concrete)
Slab (Concrete And Formwork)
Brick Works
Plaster Works
Tile And Marble Works
Paint Works
Quantity Of Substructure (Isolated Footing) Manual Calculations PDF File Or Hard Copy Of Drawings
Excavation Quantity
Formwork Calculations
Concrete Quantity
Quantity Of Different Items In Superstructure Through PDF File, Manual Calculations
Column In S.S (Formwork , Concrete)
Grade Beams (Formwork , Concrete )
Slab On Grade (Formwork, Concrete)
Lintel And Top Beam (Formwork, Concrete)
Slab (Concrete And Formwork)
Brick Works
Plaster Works
Tile And Marble Works
Paint Works
Quantity Of Substructure (Through Planswift)
Excavation Quantity
Formwork Calculations
Concrete Quantity
Quantity Of Different Items In Superstructure (Through Planswift)
Column In S.S (Formwork, Concrete)
Grade Beams (Formwork, Concrete )
Slab On Grade (Formwork, Concrete)
Lintel And Top Beam (Formwork, Concrete)
Slab (Concrete And Formwork)
Brick Works
Plaster Works
Tile And Marble Works
Paint Works
Bar bending Schedule:
Bar-bending Schedule Of Isolated Footing
Bar-bending Schedule Of Column Necks And Columns
Bar-bending Schedule Of Beams
Bar-bending Schedule Of Stairs
Bar Bending Schedule Of Slab
Bar-Bending Schedule Of Two-Way Slab
Rate Analysis Of Different Works:
Rate Analysis For Excavation
Rate Analysis For Plain Cement Concrete (P.C.C)
Rate Analysis For Reinforcement Concrete (Column Beam And Slab)
Rate Analysis For Masonry Work
Rate Analysis For Plaster Work
Rate Analysis For Tile Work
Rate Analysis For Paint Work
Material Statement :
Bill Of Quantity (B.O.Q)
Mode Of Payments To Contractor
Interim Payment
Advance Payment
Secured Advance
Petty Advance
Mobilization Advance
Procedure To Create Interim Payment In Excel From Scratch.
Variation Orders In Construction:
· Introduction To Variation Orders In Construction.
· How to Create Variation Orders In Excel.
Primavera P6 Training For Beginners
Complete Project In Primavera P6 With The Help Of MS Excel.
Creating Activity List In Ms Excel.
Add Manpower And Their Productivity In MS Excel
Adding Duration To Activities Based On Productivity
Creating Project In Primavera P6
Importing All Of Activities From Excel To P6
W.B.S And Relationship For Activities
Creating And Assigning Resources To Activities (Work And Material Resources)
Update The Project According To Actual (Time And Cost)
MS PROJECT Training For Beginners
Complete Project In MS Project With The Help Of MS Excel.
Creating Activity List In Ms Excel.
Add Manpower And Their Productivity In MS Excel
Adding Duration To Activities Based On Productivity
Creating Project In MS Project
Importing All Of Activities From Excel To MS Project
W.B.S And Relationship For Activities
Creating And Assigning Resources To Activities (Work And Material Resources)
Update The Project According To Actual (Time And Cost)
Excel Training For Beginners
Auto-cad Training
Practice Questions After the Ending Of Each Module.
Mudessar Afraz – Civil Engineer
Learning outcomes
Post this credential on your LinkedIn profile, resume, or CV, and don’t forget to celebrate your achievement by sharing it across your social networks or mentioning it during your performance review